Rhode Island Solar FAQs
What if I missed the October 16 grant round?
Round 26-3 closed October 16, 2026, and Rhode Island Commerce listed no 2027 round when we checked on October 19, 2026. Without the grant, the typical system pays for itself in about 8.3 years before incentives on net metering in our example. RE Growth stays open until its 3 MW fills or March 31, 2027.
Can I combine the grant with RE Growth?
No. One system takes the grant with net metering, or RE Growth. The grant rules say applicants choose one, not both.
Is there still a federal tax credit for solar?
No, not for a system you own that is placed in service after December 31, 2025. In Rhode Island that leaves the grant or RE Growth, net metering, and the two tax exemptions.
Do solar panels raise property taxes in Rhode Island?
No. State law exempts home renewable energy systems that went into service after December 31, 2015. If the system appears in your assessment, ask your city or town assessor to remove it.
How big can a Rhode Island home system be?
For net metering, up to 25 kW without sizing it to your past use. The grant pays per watt only up to 8.8 kW, and RE Growth’s 31.55¢ price covers systems up to 15 kW. Power left over each month earns the net metering credit, below the price you pay, so size to your bills.
Can I get RE Growth on Block Island?
No. RE Growth and ConnectedSolutions are Rhode Island Energy programs. Block Island Utility District credits all solar output at 15.40¢ in 2026. Ask Rhode Island Commerce about the grant.